Skip to content
Back to catalog
Bridges DWG · MB-111
Kyiv, Paton Bridge across the Dnipro River

Bridges · New construction

Kyiv, Paton Bridge across the Dnipro River

World's first all-welded road bridge, a 1,543 m long girder structure. Officially opened on 5 November 1953. Designed by Ukrproektstalkonstruktsia in collaboration with the Paton Electric Welding Institute.

Location Kyiv
Period 1941–1953
Work type New construction
Client —
Designer —

The bridge was designed by the Ukrproektstalkonstruktsia institute in collaboration with the E.O. Paton Electric Welding Institute.

Technical characteristics:

  • bridge length — 1,543 m;

  • carriageway clearance — 21 m;

  • footpath width — 3 m;

  • 26 girder-type spans;

  • superstructure — continuous steel with solid welded I-section main beams, 53 and 87 m long, 3.6 m high;

  • total weight of the all-welded superstructure — 10,000 tonnes.

The bridge comprises 264 identical 29 m blocks; 10,668 m of welds were laid during assembly.

Piers rest on caisson foundations.

Official opening: 5 November 1953. In 1954 a tram line was launched across the bridge (removed in 2004).

The Paton Bridge marked a global engineering breakthrough: for the first time in history, a steel bridge superstructure of such scale was fully welded, with no rivet joints.

Location

50° 25.666′ N · 30° 34.897′ E