Interchanges DWG · MB-118
South01

Interchanges · New construction

Kyiv, South Bridge Interchange

A three-level reinforced-concrete road interchange at the right-bank approach of the South Bridge Crossing over the Dnipro, at its junction with Naddniprianske Highway.

Location Kyiv
Period 1990–1992
Work type New construction
Client —
Designer —

A three-level reinforced-concrete road interchange at the right-bank approach of the South Bridge Crossing over the Dnipro, at the junction with Naddniprianske Highway.

Abutment foundations: prismatic piles 35×25 cm, 12 m long.

Intermediate pier foundations: bored piles 1,500 mm, 18–22 m long; monolithic reinforced-concrete pile caps.

Columns: precast reinforced concrete 1,200 mm, 6–12 m high.

Superstructures: reinforced-concrete girders, 27 and 33 m long.

Footpaths are precast reinforced-concrete overlays with metal railings.

Location

50° 24.029′ N · 30° 33.669′ E