Skip to content

An engineering group building Ukraine’s bridges.

More than 80 years, more than 4,000 structures, nine countries on three continents. MOSTOBUD GROUP is Ukraine’s largest bridge-building company.

We build bridges, overpasses, transport interchanges and port facilities that become part of the country’s infrastructure. Every major Dnipro crossing built in independent Ukraine carries the mark of our company.

Founded
1944, Kyiv
Structure
Group of companies
Employees
5,000+
Production capacity
11 regional bridge units
Design school
In-house design bureau since 1962
Certification
ISO 9001 / ISO 45001 / DSTU B V.2.6

What we build

Six directions. One engineering approach.

/ 01

Bridges

Beam, cable-stayed, arch and suspended-frame crossings over Ukraine’s largest rivers.

/ 02

Overpasses

Two-tier, viaduct and arch overpasses in dense urban environments.

/ 03

Transport interchanges

Multi-level junctions on highways of national importance.

/ 04

Port infrastructure

Quay reconstruction, dredging and hydrotechnical work in seaports.

/ 05

Tunnels and viaducts

Mountain and lowland viaducts, projects in the Carpathian region.

/ 06

Reconstruction

Reinforcement of load-bearing structures without halting traffic on operating bridges.

Principles

How we work.

I

Engineering, not development

We build structures with a 100+ year design life. Every decision is taken with the generations who will use the object after us in mind.

II

Working on the most demanding sites

Most of our projects are crossings that were considered technically impossible before we took them on. Complexity is our specialty.

III

Our own bridge units

Regional bridge-building divisions with the full production cycle — from design bureaus to assembly crews. We don’t depend on subcontractors at critical stages.

IV

Continuity of the school

Engineering heritage from the Mostobud No. 1 company. Young engineers join brigades that still include people who built the Pivdennyi and Podilskyi bridges.

Eighty years behind us. See how it started.

A timeline of the company — from the specialised bridge units of 1943 that followed the front line, to the Zaporizhzhia cable-stayed bridge and the “Big Construction” programme.

Read the history →