Kyiv, Bridge over the Harbour Entrance

A composite steel-reinforced-concrete bridge to the 35+45+60+75+60+45+35 m scheme, 355 m long in total. Designed by the Mostobud Design Bureau. Opened in 2007.

Location Kyiv
Period 2007–2008
Work type New construction
Client —
Designer Mostobud DB

Designer: Mostobud Design Bureau.

Technical characteristics:

  • span scheme — 35+45+60+75+60+45+35 m;

  • total length — 355 m;

  • superstructure — composite steel-reinforced-concrete.

A monolithic reinforced-concrete slab 34.55 m wide carries two 13.455 m carriageways in each direction, separated by a 0.69 m barrier. Two footpaths — 2.05 m on the Harbour side and 3.3 m on the Dnipro side.

Piers are built on bored piles 1.42 m in diameter, 39 m deep. The upper part of the piles is protected from erosion by a steel tube 1420×15.7 mm, down to 8 m below local scour level.

One carriageway was opened for working traffic in one direction in 2007.