Bridges · New construction
Kyiv, Bridge over the Harbour Entrance
A composite steel-reinforced-concrete bridge to the 35+45+60+75+60+45+35 m scheme, 355 m long in total. Designed by the Mostobud Design Bureau. Opened in 2007.
Designer: Mostobud Design Bureau.
Technical characteristics:
span scheme — 35+45+60+75+60+45+35 m;
total length — 355 m;
superstructure — composite steel-reinforced-concrete.
A monolithic reinforced-concrete slab 34.55 m wide carries two 13.455 m carriageways in each direction, separated by a 0.69 m barrier. Two footpaths — 2.05 m on the Harbour side and 3.3 m on the Dnipro side.
Piers are built on bored piles 1.42 m in diameter, 39 m deep. The upper part of the piles is protected from erosion by a steel tube 1420×15.7 mm, down to 8 m below local scour level.
One carriageway was opened for working traffic in one direction in 2007.