Skip to content
Back to catalog
Bridges DWG · MB-129
Photo 2023 01 26 15 18 37

Bridges · Current repair

Kropyvnytskyi, bridge repair (40 m)

Repair of an urban bridge in Kropyvnytskyi, 40 m long. Works in 2018–2019. Client: Housing and Utilities Department of the Kropyvnytskyi City Council.

Location Kropyvnytskyi
Period 2018–2019
Work type Current repair
Client Kropyvnytskyi HUD
Designer —

Client: Housing and Utilities Department of the Kropyvnytskyi City Council.

Construction period: 2018–2019.

Structure: bridge length — 40 m.

Note: the source brochure duplicates the page header from the previous (M-21) project. The exact bridge number and location in Kropyvnytskyi should be verified before publishing.

Location

48° 30.074′ N · 32° 15.973′ E