Odesa, cable-stayed bridge in Odesa Sea Commercial Port

A steel cable-stayed bridge 150.5 m long with a 114.7 m main span. Orthotropic deck, open main girders. Built in 2 years (1996–1998).

Location Odesa
Period 1996–1998
Work type New construction
Client —
Designer —

Designed by Mosty i Inzhenernye Tekhnologii Ltd.

Technical characteristics:

  • stiffening girder scheme — 35+114.7 m;

  • total bridge length — 150.5 m;

  • stiffening girder width — variable, up to 12.8 m in the constant section;

  • carriageway width — 10 m;

  • steel pylon height — 54.08 m.

In cross-section the superstructure is an orthotropic deck supported at its edges by open main girders. The steel pylon has a box cross-section.

Construction period: 2 years (1996–1998).

Location

46° 29.623′ N · 30° 44.184′ E