In 2018 capital repairs began on Kyiv's Rusanivka Metro Bridge — the structure linking the left bank with the Livoberezhna metro station.
Works included replacing metal elements inside the bridge, refurbishing load-bearing structures, repairing footpaths, and upgrading lighting. The repair continued through 2019.
The Rusanivka Metro Bridge is part of the Kyiv Metro transport system; its condition is critical to the operation of the Syretsko-Pecherska line.