Port facilities DWG · MB-124
Port facilities · New construction
Odesa, Berth 1-z for general cargo at Androsov Mole
A berth for container handling of general cargo at Odesa Sea Commercial Port. Launch-phase length — 162.683 m; design seabed depth — 12 m.
Revisions to the hydraulic part of the Berth 1-z design were prepared by ECON Ltd. to meet the Port's need to handle general cargo in containers only.
Scope of Launch Phase No. 3-A:
construction of the berth;
dredging: Berth 1-z designed for 12 m depth alongside.
Technical characteristics:
launch-phase berth length — 162.683 m;
structure — anchored bulkhead;
front wall — PU-32 steel sheet piles;
screening row — 1220×15.4 mm steel tubular piles;
anchorage — 125 mm tie rods;
anchor wall — PU-32 sheet piles.
Construction started in 2009.
Location
46° 29.767′ N · 30° 44.207′ E