Interchanges DWG · MB-122
Odesa, off-ramp from the Stage-III viaduct at Odesa Sea Commercial Port

Interchanges · New construction

Odesa, off-ramp from the Stage-III viaduct at Odesa Sea Commercial Port

A reinforced-concrete viaduct 239.7 m long in the Androsov Lane area. 8 spans of 24 m with individual prestressed girders.

Location Odesa
Period 2008–2009
Work type New construction
Client —
Designer Kyivbudindustria

Designed by Kyivbudindustria CJSC scientific-industrial association.

Technical characteristics:

  • road category — II (industrial-zone roads);

  • design speed — 40 km/h;

  • viaduct scheme — 2×12+8×24 m;

  • total viaduct length — 239.7 m;

  • carriageway width — 7 m (2 lanes);

  • ramp width — 11.62 m;

  • maximum longitudinal gradient — 50 per mille;

  • design live load — A-15, NK-100.

The viaduct section comprises a monolithic reinforced-concrete connection to the existing Stage-III port viaduct and an eight-span girder section of precast reinforced-concrete 24 m beams of individual design with prestressed reinforcement. The curvature of the viaduct in plan is achieved by laying the beams along chords.

Intermediate piers are individually designed reinforced-concrete elements on deep foundations with 1.5 m bored piles up to 32 m long. The approach is in retaining walls of precast reinforced-concrete blocks.

Construction period: 1 year (2008–2009).

Location

46° 29.297′ N · 30° 44.910′ E